91st Military Police Barracks

Fort Drum, NY

Purcell was the design builder for the $54 million 91st Military Police Barracks Facility which included the construction of 3 new three story barracks buildings totaling approximately 250,000 SF. The complex was designed to house a total of 672 personnel on an approximately 37 acre site in Fort Drum, NY. The 3 story “L” shaped buildings were configured to create a contained “quad” type exterior space. Additional site considerations were given to account for future development on the site.

The barracks structure is load bearing light gauge metal framing selected for speed of construction, utilizing prefabricated wall panels. The design incorporated Anti-terrorism/Fort Protection (ATFP) as well as progressive collapse criteria. Each living unit contains a kitchen, a shared bath, and two single-person bedrooms. Laundry, vending and recycling areas are located in the center area of each building, and a day room is located in the first floor center area.

Contract Value

$54,490,492

Type of Contract:

Design/Build General Contractor

Architect:

Beardsley Design Associates

Korwek Family Dental

Expanded medical office building near Washington Street with a new suite including waiting area, reception area, children’s play area, and dental exam rooms.

View Project

River Hospital, New MOB & Existing Building Renovations

Renovations for River Hospital, including a new Medical Office Building, renovations to the existing hospital, and site improvements, with funding from the NYS Department of Health.

View Project

Watertown Savings Bank

The new Clayton Branch of Watertown Savings Bank, featuring a two-story building with drive-through teller lanes, offices, and a conference room, after demolishing the old branch.

View Project

Purcell effectively managed this project with a dedicated team of professional leaders, managers and staff. From design to execution to completion, their work ethic, quality control and safety programs, management of subcontractors and meeting scheduled milestones is reflected in the overall success of the project.