Fire and Emergency Services – Phase III

Norfolk, VA

This Design/Build project consists of the design and construction of the third phase of the Fire and Emergency Services Center Facility at Ft. Lee, VA. This 12,400 sf addition to the existing building is located on the corner of 5th Street between Adams Avenue and Byrd Streets, Fort Lee, Virginia. The building addition includes a one story dormitory facility design and was constructed to support two stories for future expansion. The main building includes 10 drive-through apparatus bays. Construction is a load bearing masonry and steel frame structure, brick and cast stone veneer with a structural standing seam metal roof system. Interior is completely finished including casework, building equipment, programmable DDC system, PA system, vehicle exhaust system, hose reels assemblies, custom firemen lockers, heating system, lighting, power, communications, and fire protection. The facility matches the architecture of the Phase I construction to produce a homogeneous completed structure. Beardsley Design Associates provided design services to the Design/Build Team.

Contract Value

4,459,113

Architect:

Mr. Kevin Arthur

Dick’s House of Sport

Revamped Oakdale Commons retail space that we transformed into the largest Dick’s House of Sport ever at the time of construction.

View Project

3500 West View Apartments

A luxury apartment building in Henrico, VA that offers an array of enticing amenities.

View Project

Korwek Family Dental

Expanded medical office building near Washington Street with a new suite including waiting area, reception area, children’s play area, and dental exam rooms.

View Project

Samaritan’s decision to partner with Purcell Construction and the Purcell-Lecesse joint venture turned out to be the right one. Through this partnership, the Purcell-Lecesse team was able to create a unique construction process that enabled the project to stay within extreme timelines and budget.