Carthage Area Hospital Addition and Reconstruction

Carthage, NY

The project consisted of new construction and renovations totaling approximately 34,500 SF. A 26,500 SF addition was constructed consisting of 4 operating rooms, 8 Labor and Delivery Suites, a new Central Sterile Supply unit, 12 Pre-Op prep rooms, 4 Recovery rooms, new Medical Records offices and new Accounting Offices. The project also consisted of +/- 8000 SF of renovated space in which a new MRI Suite was added as well as a 4 bed Critical Care Unit, a new Laboratory Suite and new Executive Offices.

The project presented particular challenges because it required extensive demolition and asbestos abatement
within an existing operating hospital. The patients and staff of the occupied hospital were of utmost concern
and particular care was taken to ensure their safety during the construction process.

Contract Value

7262000

Architect:

Bernier, Carr & Associates

Korwek Family Dental

Expanded medical office building near Washington Street with a new suite including waiting area, reception area, children’s play area, and dental exam rooms.

View Project

River Hospital, New MOB & Existing Building Renovations

Renovations for River Hospital, including a new Medical Office Building, renovations to the existing hospital, and site improvements, with funding from the NYS Department of Health.

View Project

Watertown Savings Bank

The new Clayton Branch of Watertown Savings Bank, featuring a two-story building with drive-through teller lanes, offices, and a conference room, after demolishing the old branch.

View Project

Purcell Construction has been great to work with. All of the employees are very professional, knowledgeable, and friendly, with a helpful “can do” attitude. They are eager to please the client, which is very important to me. The Purcell Team does what they say they will do. Most of all, I trust Purcell to get the job done right.