Maneuver Area Training Equipment Site (VA)

Fort Pickett, VA

This facility was designed to provide maintenance and repair areas for the Virginia Army National Guard unit’s equipment, and increase hard standing parking areas, administrative support areas, vehicle painting and preparation areas, perimeter/security fencing, and associated site improvements. This project included the design of three (3) buildings, approximately 150,000 sf, containing maintenance, work bay, and support administrative spaces. Each work bay has a petroleum/oil/lubricant central distribution system, overhead bridge crane service and large overhead doors. A fourth building contains a sand blast paint preparation booth and a paint spray booth for repaint of large tracked military vehicles. The project also included an unheated warehouse and secure vault. Construction included the demolition of six (6) World War II-era structures including all utilities and surrounding improvements associated with these structures. Asbestos and lead abatement programs were developed prior to the demolition of the structures. A storm water pollution and prevention plan was developed for the 24-acre site in two months, which required two (2) 20,000 SF subsurface storm water detention basins.

Contract Value

17,702,127

Type of Contract:

General Construction

Architect:

US Army Corps of Engineers, Huntsville Division, Setty & Associates, LTD

Shiplock Views

This project was constructed into a side hill on the corner of Pear and Main in Richmond and contains 180 apartments.

View Project

The Arc Jefferson-St. Lawrence

The Arc Jefferson-St. Lawrence serves many of it’s clients through it’s main building on Gaffney Drive in Watertown. This renovation project ensured the continuation of its adult day hab and children’s preschool programs offered on site at this main building.

View Project

Market Street Lofts

An old warehouse in Petersburg, VA was transformed into 102 apartment units through this historic renovation.

View Project

The contractor’s quality control staff were very proactive in their duties and any noted deficiencies were corrected immediately. The quality of workmanship was excellent... This contractor is one of our best performers.