Mock Village/Shoot House

Fort Drum, NY

The Mock Village and Shoot House project involved the construction of an Afghanistan Village Complex on approximately 5 acres on Ft. Drum, NY. The mock village is a MOUT (Military Operations on Urban Terrain) consisting of 35 container structures, simulating an Afghan-style village, divided into two separate walled compounds. This complex allows soldiers to practice the skills they will need during expected deployments to Afghanistan. Training includes learning the basics of entering a foreign village, marksmanship training, self-protection, patrolling techniques and community interaction.

The structures that comprise the mock village are constructed out of SACON® (Shock Absorbing
Concrete), which absorbs the rounds that are fired, with bullets only penetrating 3 inches into the material.
These structures are designed to replicate buildings with compartmentalized rooms and hallways, so
soldiers can use them to practice how they would enter and clear a building, and efficiently secure the
facility.

Contract Value

1,492,415

Architect:

Beardsley Design Associates

Dick’s House of Sport

Revamped Oakdale Commons retail space that we transformed into the largest Dick’s House of Sport ever at the time of construction.

View Project

3500 West View Apartments

A luxury apartment building in Henrico, VA that offers an array of enticing amenities.

View Project

Korwek Family Dental

Expanded medical office building near Washington Street with a new suite including waiting area, reception area, children’s play area, and dental exam rooms.

View Project

Purcell Construction has been great to work with. All of the employees are very professional, knowledgeable, and friendly, with a helpful “can do” attitude. They are eager to please the client, which is very important to me. The Purcell Team does what they say they will do. Most of all, I trust Purcell to get the job done right.