SUNY Brockport

Brockport, NY

Working interactively with DASNY and SUNY Brockport campus staff, our design-build team developed a project which meets functional space needs of the residence life staff and students, while maintaining an affordable project budget. Focusing on amenity spaces in the central core of the building, our team was able to ensure the long term needs of students will be met. The design layout fosters a collaborative learning environment including technology-rich classrooms, group study rooms, student lounges and multipurpose space. The building features 267 beds in the following configuration: seven (7) ADA singles, 256 doubles, and four (4) RD apartments.

Contract Value

$20,659,000

Type of Contract:

Design-Build Contractor

Architect:

Mach Architecture

Korwek Family Dental

Expanded medical office building near Washington Street with a new suite including waiting area, reception area, children’s play area, and dental exam rooms.

View Project

River Hospital, New MOB & Existing Building Renovations

Renovations for River Hospital, including a new Medical Office Building, renovations to the existing hospital, and site improvements, with funding from the NYS Department of Health.

View Project

Watertown Savings Bank

The new Clayton Branch of Watertown Savings Bank, featuring a two-story building with drive-through teller lanes, offices, and a conference room, after demolishing the old branch.

View Project

The contractor’s quality control staff were very proactive in their duties and any noted deficiencies were corrected immediately. The quality of workmanship was excellent... This contractor is one of our best performers.